Enables people unfamiliar with ACE to run ACE-hosted models from a familiar application
View ACE models, create new cases and even run simulations all within Excel
Export charts to Word/PowerPoint; update entire presentations instantly
Quickly create a wide array of tabular reports and graphical charts within Excel
Different views of all your point estimates

Example Sand Chart:
Stacked annual total costs displayed by fiscal year
Example Drill-Down Pie Chart:
A total cost split into children costs at a chosen WBS level
A variety of methods to understand the uncertainty in your model

Example RI$K Chart:
S-Curve with markers at specified probability levels
Example Scatter Plot:
Each iteration of two uncertain elements plotted against each other
Example Fan Chart:
Specifed ranges of uncertainty plotted by fiscal year
Compare results between rows, across cases and over years

Example Drill-Down Chart:
Compare results at a specified WBS level from different cases
Example What-If Case Report:
Tabular report highlighting differences in the model across various cases
Example Phased Line Chart:
Plot a single row's annual results from different cases
Quickly determine what the model is most sensitive to and which elements have the greatest influence on the cost and uncertainty results
Example Tornado Chart:
Individually adjust variables to measure their effect on the total
Example Variance Analysis Chart:
Find elements contributing most to the total variance (uncertainty)